We offer a full cycle of a renewable energy station creation: from design to profit earning for electricity production

Order consultation

Scroll for more

Our services

Consulting

We provide our clients with comprehensive consulting on the process of solar power stations creation, help to make necessary calculations.

Design

We develop a comprehensive project for the solar power plants construction and their connection to the Distribution system operator networks.

Solar power station construction

We take on the process of the actual creation of the solar power station: organization of the materials supply, construction up to its commissioning and connection to the Distribution system operator networks.

Monitoring, service and operation

We provide regular monitoring of equipment operation, and carry out scheduled activities for reliable operation and efficient performance of solar power plants. We also carry out maintenance and repair work.

Assistance in obtaining
a credit

We help to choose a bank and to attract credit funds for the solar power station construction.

Obtaining permissions


We help to obtain licenses at NKREKU and to draw up an agreement with the SE "Guaranteed Buyer".

Technical audit

Identify possible problems and shortcomings in the operation of electrical equipment, we provide recommendations for their elimination and increase the productivity of the solar power plant in general.

We provide wholesale supplies of solar panels from the world's best manufacturers

We supply products by container norms at exclusive prices (14-60 calendar days). All manufacturers' warranty obligations remain valid.

Construction of transformer substations and networks

We carry out a full range of works on designing, constructing and reconstructing transformer substations and power lines with a voltage class of 35 kV and 110 kV.

Each solar power station we create with you is not just a profitable financial investment. This is a contribution to your future and the future of your children.

Our work combines environmental concerns with cost-effectiveness. Investing in green energy is truly profitable thanks to the green tariff.

Green tariff is a special tariff at which the state represented by the state-owned enterprise “Guaranteed Buyer” buys from enterprises and individuals, electricity produced using renewable energy sources - the sun, wind, biomass, as well as water (small hydropower plants).

We have developed for you an income calculator depending on solar power station power.

Calculation of the annual revenue is based on the tariff in effect in 2022 for a ground-based solar power plant with a capacity of up to 1 MW. Such an indicator can be obtained if the solar power station is located in the central region of Ukraine. The southern regions of Ukraine can generate 6-8% more generation, and the northern regions - 8-10% less.

Solar power station power by photovoltaic modules
Annual generation volume
Solar power station payback period
about 5 years
Revenue with VAT

reasons to invest in creation of an alternative energy station

Solar power station construction period is only 5-6 months

This term includes all stages of work, together with registrations and design work

Solar power station revenue is fixed in euros

The state represented by the state-owned enterprise “Guaranteed Buyer” buys green energy at a rate fixed in euros until 2030.

Payback period is about 5 years

And you will receive the first revenue in the next month after commissioning the solar power station.

State guarantee of 100% of the generated energy realization

Guaranteed by the law of Ukraine “On Alternative Sources of Energy"

Our projects

Construction of the ground SPS

Power: 0.76 MW

town Kalynivka, Vinnytsia region

Completed works:

LEGAL SUPPORT

ASSISTANCE IN OBTAINING CREDIT

DESIGN

CONSTRUCTION AND INSTALLATION WORK

PROCUREMENT

CONNECTION TO THE NETWORKS OF Distribution system operator

Service and maintenance

Built in 2019.

Construction of the roof SPS

Power: 1,15 MW

town Kalynivka, Vinnytsia region

Completed works:

LEGAL SUPPORT

ASSISTANCE IN OBTAINING CREDIT

DESIGN

CONSTRUCTION AND INSTALLATION WORK

PROCUREMENT

CONNECTION TO THE NETWORKS OF Distribution system operator

Service and maintenance

Built in 2019.

Construction of ground SPS

Power: 2,25 MW

village Bilozirya, Cherkasy region

Completed works:

Design

Procurement

Construction and installation work

Connection to the networks of Distribution system operator

Testing and adjustment

Service and maintenance


Built in 2019.

Engineering of ground SPS

Power: 8 MW

village Yakushintsi, Vinnytsia region

Completed works:

DESIGN

Garbage removal

Works on the vertical leveling of the land plot

Built in 2020.

Constraction of Enclosed type electric power substation 35kV

for the solar power plant with a capacity of 7 MW

village Babaykivka , Dnipropetrovsk region

Сompleted works:

Design

CONSTRUCTION AND INSTALLATION WORK

Testing and adjustment

Design and installation of electricity metering system

Design and installation of relay board and telemechanics systems

Built in 2020.

Construction of ground SPS II phase

Power: 1 MW

village Bilozirya, Cherkasy region

Completed works:

Design

Procurement

Construction and installation work

Connection to the networks of Distribution system operator

Testing and adjustment



Built in 2020.

Building of ground SPS on a uniaxial tracking system

Power: 1 MW

village Ovidiopol, Odesa region.

Completed works:

Design

Procurement

construction and installation work

Testing and adjustment

Design and installation of electricity

Design and installation of relay protection and telemechanics systems

Built in 2021.

Building of ground SPS

Power: 1 MW

village Bratske, Mykolaiv region.

Completed works:

construction and installation work

Testing and adjustment

CONNECTION TO THE NETWORKS OF Distribution system operator

Built in 2021.

Building of ground SPS-1

Power: 0,24 MW

village Bratske, Mykolaiv region.

Completed works:

construction and installation work

Testing and adjustment

Connection to the networks of Distribution system operator

Built in 2021.

Building of ground SPS-2

Power: 0,24 MW

village Bratske, Mykolaiv region.

Completed works:

construction and installation work

Testing and adjustment

Connection to the networks of Distribution system operator

Built in 2021.

Construction of the roof SPS

Power: 0,5MW

town Kakhovka, Kherson region

Сompleted works:

Design

Procurement

Construction and installation work

Testing and adjustment

Built in 2021.

Construction of the ground SPS

Power: 0.6MW

village Krasnenke Vinnytsia region.

Сompleted works:

Design

Procurement

Construction and installation work

Legal support

Connection to the networks of Distribution system operator

Design and installation of electricity

Design and installation of relay board and telemechanics systems

Testing and adjustment

Service and maintenance

Built in 2022.

Repair of OHL-35 kV and SS-35/10


м. Gostomel, Kyiv region

Completed works:

Repair of OHL-35 kV

Replacing the cable

Replacement of reinforced concrete and corner supports U35-1

Repair of substation 35/10 "Gostomel"

Replacement of cable glands at SS 110/35/27 Bucha

Built in 2022.

Reconstruction of SS 150/35/10 Pervomaiskaya


Mykolaiv region.

Completed works:

installation of the Recon emergency event recorder

replacement of current and voltage transformers

Built in 2022.

Installation of autonomous electric power supply system

Power: 10 kW

Rechargeable batteries with a total capacity of 20.3 kW•h

Private residential building in the Kyiv region

Completed works:

Design work

Procurement activities

Electrical installation works

Testing and adjustment

Completed in 2023

Construction of the roof SPS

Power: 1MW

village Kobleve Mykolaiv region.

Сompleted works:

Design

Procurement

Construction and installation work

Legal support

Connection to the networks of Distribution system operator

Design and installation of electricity

Design and installation of relay board and telemechanics systems

Testing and adjustment

Planned date of construction works completion: 2024

Founders

Oleksandr Loboda

Co-founder and Director

Graduated from Zaporizhzhya National Technical University with a degree in enterprise management.

Since 2010 has been working in the energy industry construction taking leadership positions.

o.loboda@ecosphere.com.ua

Oleg Goncharuk

Co-founder

Graduated from Kyiv National Economic University with a degree in Business Administration.

Second-generation entrepreneur.

oleg.goncharuk@ecosphere.com.ua

Licenses, permits, certificates and awards

Feedback

Thanks for contacting us! We will contact you shortly.
Error occurred while submitting the form. Please try again later.