Creation of solar power stations
for businesses and enterprises
from design to commissioning.
Pay 0.6 UAH per 1 kW*hour instead of 10 UAH.

Request a consultation

Scroll for more

What we do

Consulting


For our clients, we provide comprehensive advice on the process of creating solar power stations, we help to carry out the necessary calculations.

Design of solar power stations


We are developing a comprehensive project for the construction of solar power plants.

Construction of solar power stations

We take over the process of the actual creation of solar power stations: from the equipment and materials to the construction and installation works, adjustment and testing.

Monitoring, service and operation

We provide regular monitoring of equipment operation, and carry out scheduled activities for reliable operation and efficient performance of solar power plants. We also carry out maintenance and repair work.

Assistance in obtaining
a loan


If necessary, we help to choose a bank and help to attract credit funds for the construction of solar power stations.

We provide wholesale supplies of solar panels from the world's best manufacturers

We supply products by container norms at exclusive prices (14 - 60 calendar days). All manufacturers' warranty obligations remain valid.

Possibilities of solar power stations

Energy independence

Your solar power stations will reduce the impact of electricity suppliers and higher tariffs on the operation of your business.

Reduced energy costs

The generation of electricity from solar power stations can significantly reduce the cost of electricity.

No constant running costs

Solar power stations do not require regular maintenance costs.

Quick start

You will be able to commission the solar power plant quickly. The maximum construction period for the facility is just from 1 to 3 months.

Solar Power Station Calculator for self-consumption electricity generation

We have developed a calculator that will help you choose a solar power station that is right for you

* - the calculation takes into account the average cost of electricity for legal entities in Ukraine in the 1th quarter of 2025 in $ including VAT

Yearly generation volume
Average monthly generation volume
Station power by photovoltaic modules
Roof area
Annual savings from the operation of the Solar Power Station
Monthly savings from the operation of the Solar Power Station

Solar power stations are environmentally friendly. They are safe for health and the environment.

At the same time, our work combines environmental care with economic efficiency.

reasons to invest in solar power stations

The construction period for the solar power station is from 1 month upwards

This term includes all stages of work: from design to the start of generation.

Payback period is about 2.5 years

And you get a tangible effect from the work of the solar power station the next month after the solar power station is put into operation.

Service life from 25 years

From the moment of commissioning, the solar power stations will operate effectively for at least a quarter of a century.

The solar power stations are cost effective

The creation of solar power stations is provided by a one-time investment. Refunds occur from the moment the solar power station is launched. Additional costs are not required.

Our projects

Construction of the ground SPS

Power: 0.76 MW

town Kalynivka, Vinnytsia region

Completed works:

LEGAL SUPPORT

ASSISTANCE IN OBTAINING CREDIT

DESIGN

CONSTRUCTION AND INSTALLATION WORK

PROCUREMENT

CONNECTION TO THE NETWORKS OF Distribution system operator

Service and maintenance

Built in 2019.

Construction of the roof SPS

Power: 1,15 MW

town Kalynivka, Vinnytsia region

Completed works:

LEGAL SUPPORT

ASSISTANCE IN OBTAINING CREDIT

DESIGN

CONSTRUCTION AND INSTALLATION WORK

PROCUREMENT

CONNECTION TO THE NETWORKS OF Distribution system operator

Service and maintenance

Built in 2019.

Construction of ground SPS

Power: 2,25 MW

village Bilozirya, Cherkasy region

Completed works:

Design

Procurement

Construction and installation work

Connection to the networks of Distribution system operator

Testing and adjustment

Service and maintenance


Built in 2019.

Engineering of ground SPS

Power: 8 MW

village Yakushintsi, Vinnytsia region

Completed works:

DESIGN

Garbage removal

Works on the vertical leveling of the land plot

Built in 2020.

Constraction of Enclosed type electric power substation 35kV

for the solar power plant with a capacity of 7 MW

village Babaykivka , Dnipropetrovsk region

Сompleted works:

Design

CONSTRUCTION AND INSTALLATION WORK

Testing and adjustment

Design and installation of electricity metering system

Design and installation of relay board and telemechanics systems

Built in 2020.

Construction of ground SPS II phase

Power: 1 MW

village Bilozirya, Cherkasy region

Completed works:

Design

Procurement

Construction and installation work

Connection to the networks of Distribution system operator

Testing and adjustment



Built in 2020.

Building of ground SPS on a uniaxial tracking system

Power: 1 MW

village Ovidiopol, Odesa region.

Completed works:

Design

Procurement

construction and installation work

Testing and adjustment

Design and installation of electricity

Design and installation of relay protection and telemechanics systems

Built in 2021.

Building of ground SPS

Power: 1 MW

village Bratske, Mykolaiv region.

Completed works:

construction and installation work

Testing and adjustment

CONNECTION TO THE NETWORKS OF Distribution system operator

Built in 2021.

Building of ground SPS-1

Power: 0,24 MW

village Bratske, Mykolaiv region.

Completed works:

construction and installation work

Testing and adjustment

Connection to the networks of Distribution system operator

Built in 2021.

Building of ground SPS-2

Power: 0,24 MW

village Bratske, Mykolaiv region.

Completed works:

construction and installation work

Testing and adjustment

Connection to the networks of Distribution system operator

Built in 2021.

Construction of the roof SPS

Power: 0,5MW

town Kakhovka, Kherson region

Сompleted works:

Design

Procurement

Construction and installation work

Testing and adjustment

Built in 2021.

Construction of the ground SPS

Power: 0.6MW

village Krasnenke Vinnytsia region.

Сompleted works:

Design

Procurement

Construction and installation work

Legal support

Connection to the networks of Distribution system operator

Design and installation of electricity

Design and installation of relay board and telemechanics systems

Testing and adjustment

Service and maintenance

Built in 2022.

Repair of OHL-35 kV and SS-35/10


м. Gostomel, Kyiv region

Completed works:

Repair of OHL-35 kV

Replacing the cable

Replacement of reinforced concrete and corner supports U35-1

Repair of substation 35/10 "Gostomel"

Replacement of cable glands at SS 110/35/27 Bucha

Built in 2022.

Reconstruction of SS 150/35/10 Pervomaiskaya


Mykolaiv region.

Completed works:

installation of the Recon emergency event recorder

replacement of current and voltage transformers

Built in 2022.

Installation of autonomous electric power supply system

Power: 10 kW

Rechargeable batteries with a total capacity of 20.3 kW•h

Private residential building in the Kyiv region

Completed works:

Design work

Procurement activities

Electrical installation works

Testing and adjustment

Completed in 2023

Connection of a cogeneration unit

Power: 1501 kW

Vinnytsia region

Works are in progress:

Design works

Procurement works

Construction and installation works

Design and installation of relay protection, telemechanics and dispatching system

Legal support

Connection to Oblenergo networks

Testing and adjustment

Expected completion date -
first quarter of 2025

Construction of the roof SPS

Power: 1MW

village Kobleve Mykolaiv region.

Сompleted works:

Design

Procurement

Construction and installation work

Legal support

Connection to the networks of Distribution system operator

Design and installation of electricity

Design and installation of relay board and telemechanics systems

Testing and adjustment

Expected construction completion date -
first quarter of 2025

Founders

Oleksandr Loboda

Co-founder and Director

Graduated from Zaporizhzhya National Technical University with a degree in enterprise management.

Since 2010 has been working in the energy industry construction taking leadership positions.

o.loboda@ecosphere.com.ua

Oleg Goncharuk

Co-founder

Graduated from Kyiv National Economic University with a degree in Business Administration.

Second-generation entrepreneur.

oleg.goncharuk@ecosphere.com.ua

Licenses, permits, certificates and awards

Feedback

Thanks for contacting us! We will contact you shortly.
Error occurred while submitting the form. Please try again later.